THIS INFORMATION IS FOR HEALTHCARE PROFESSIONALS ONLY

1E29

Midshaft deformity in a short humerus; Limb Reconstruction System with Acute Correction Template.

(a) Clamp template on rail and acute correction template at end of rail.

(b) Osteotomy and correction of deformity; definitive fixator in place.

(c) Lengthening at site of original deformity.

Caution: radial nerve, open procedure for all screws.

Equipment required
Q.tyCatalogue N.Description
1

14133

 

LRS STRAIGHT CLAMP TEMPLATE FOR ACUTE CORRECTION

1

14107

 

LRS STRAIGHT CLAMP TEMPLATE

1

55010

 

PAEDIATRIC LRS STANDARD KIT

4

99-60139

 

OSTEOTITE BONE SCREW 130/30 MM SHAFT D 6 MM THREAD D 6-5 MM

Operative techniques

Limb Reconstruction System - Part B: Correction of Deformities

Videos
Pin Site Care
Instructions for use

PQ_DYB - Orthofix LRS Dyna Block

PQ_EXF - Orthofix External Fixation System

PQ_ISP - Orthofix Fixation System Medical Devices

PQ_REC - Reconstruction Systems

PQ_SCR - Orthofix Bone Screws for External Fixation System

PQ_SUO - Risks Due to the Re-Use of "Single Use" Device

FROM THE BLOG

Post-Operative Management of Deformity Correction Surgery with External Fixation

2023-11-09

The successful outcome of a deformity correction with external fixation surgery relies also on a meticulous post-operative management approach. It is critical to optimal healing and the restoration of functionality. Wound care, pain control, rehabilitation exercises, monitoring of complications, and regular follow-ups are integral to a faster recovery.[1]

Read More
Weight Bearing and Dynamization

2021-11-17

Weigh bearing is considered a significant clinical issue particularly when an external fixator has been applied to a lower limb. If mechanical stability is in fact a mandatory condition for promoting fracture healing, other key components for a full recovery of the bone are early weight bearing and dynamization.

Read More